shed number two

And another beautiful day in paradise. Our van packed full with stuff, all there again to hit the ground running at 7am. Timberwork is mostly easy, it’s all designed and on the plan not much to go wrong. It just needs some thinking of where to notch a post and by how much. And if not otherwise possible to strap a post a bit back, to bring it ‘into the building’. We are working with timber, no 2 posts are the same and even the dressed timber is everything else but the same!

unloading timber the kiwi way
Photo1171
Photo1186
Photo1187
Photo1188
Photo1189
Photo1192
Photo1197
DSCN3867
Photo1201
Photo1202
bracings with thensioners
Photo1203
strings as guides
Photo1215
Photo1216
first window is framed
Photo1218
Photo1230
Photo1206
internal wall and the creators
Photo1236
NextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnail

 


Leave a Reply

Your email address will not be published. Required fields are marked *